Medicus Healthcare Solutions

TFMoran provided structural design and construction administration for this two phase new office building complex. Phase I is a two story 30,000sf building, Phase II is a three-story, 29,000sf building connected at the second floor to Building One. The construction is of steel and concrete, steel roof, and floor framing is supported on energy efficient insulated concrete formed walls at the exterior. Berard-Martel Architecture of Bedford, NH is the project architect.

  • Client: Berard-Martel Architecture
  • Services: Structural Engineering