Archive

0

Sig Sauer Breaks Ground for new “Experience Center”

Sig Sauer celebrated the construction start of their new “Experience Center” with an official groundbreaking ceremony on Friday, May 7, 2021. The new 40,500sf state-of-the-art center will be located at the entrance of the Sig Sauer Academy training facility on Route 27 in Epping.

Sig Sauer’s president Ron Cohen was joined by NH Governor Chris Sununu in describing the project and what it means for New Hampshire and the economy. Sig Sauer started in the Granite State 16 years ago and is now one of New Hampshire’s largest employers.  Other state representatives, local officials and representatives of law enforcement were in attendance, along with Sig Sauer staff and the project team of Cowan Goudreau Architects, North Branch Construction and TFMoran.

TFMoran is providing civil engineering, permitting, survey, landscape design and construction administration services for the project. The new $13.5 million Experience Center will include retail and office space, training and education rooms, indoor firing range and Sig Sauer museum space. The facility is expected to open next summer.

To read more about the project, click on the news articles below:

Portsmouth Herald Sig Sauer Breaks Ground 5-10-21

Union Leader Sig Sauer Groundbreaking 05-11-21

 

 

 

0

Breaking Ground at Uni-Cast

TFMoran recently attended the groundbreaking ceremony at Uni-Cast held on Monday June 24th.

In attendance (left to right) were Dan Boisvert- Boisvert Electric President, Paul Berube- Uni-Cast, Andrew Murray- SADCO, Dave Fuller- SADCO, Nick Golon- TFMoran Sr. Project Manager, Henri Fine- President of Uni-Cast, Jeremy Belanger- TFMoran Sr. Project Engineer, Peter Flynn- Flynn Construction Corp., and John Turner- Team Engineering President.

The project is set to involve an expansion of the existing facility located on Industrial Drive in Londonderry, New Hampshire. Uni-Cast is a manufacturer of sophisticated aluminum castings known for their strict quality control and capability to produce some of the industry’s more challenging applications.

Henri Fine, President of Uni-Cast

The proposed expansion includes an over 9,600 sf manufacturing, and 900 sf office addition to the north side of the building, as well as another 2,700+ sf manufacturing addition on the south side of the building. Additional improvements include parking lot expansion and the rebuilding of their stormwater detention basin to current Town and State standards.

TFMoran provided Site Design, Civil Engineering, Permitting, Survey, and Landscape Architecture services.

Architectural elevation plans courtesy of Team Engineering.

Congratulations to Uni-Cast!